

Precision Electrical Takeoffs and Bid Packages
Every takeoff delivers clean spreadsheets and marked drawing sets ready for direct import into your bidding software.
Switchgear and Lighting Schedules
Branch Conduit and Wire Runs
Bid-Ready Summary Sheets
Detailed counts for main distribution panels, transformers, disconnect switches, and complete luminaire packages aligned to project specifications.
Point-to-point measurements for EMT, rigid pipe, MC cable, and copper branch wiring factored for elevation transitions and make-up lengths.
Consolidated material purchase bills, labor unit allocations, and audit-ready takeoff markups calibrated directly to your bid day deadline.
Measured in Linear Feet
48 Hrs
average drawing turnaround
100%
line-item plan verification
50 States
commercial code coverage
Send Drawings and Addenda
Upload project specs, drawing links, and bid closing dates. Our estimating desk returns an itemized proposal within four business hours.
